Repair and Double Bituminous Surface Treatment (DBST) works for Approach Road of Mukterpur Bridge
Periodic Road Maint. Component Contract # 3, for Periodic Maintenance of i) Beldanga-Panchagarh, National Road (N5)-76.183km; ii) Dinajpur-Beldanga, National Road (N508)-15.39km, under RNIMP-I
Construction of Shahid Ahsan Ullah Master Ural Setu (Tongi Flyover) over Rail Crossing at Tongi, Gazipur
Improvement of Dhunot-Shariakandi Road under Dhunot Upazila of Bogra District, Contract Package no. Bog/UZR-27
Re-sectioning and Armouring of Gopaljhar assisting earthen Spur at km 38.99 on right embankment of Teesta River in connection with EDDRP (Part-E) at Gopaljhar” in Upazila-Jaldhaka, District Nilphamari.
River Bank Protection work along the left bank of the river Mohananda at Baliaghata
Bank Revetment work along the left bank of River Padma at Mirerchara
Temporary emergency protection of left bank of the Padma River from Meterge (-) 11628.00 to Meterege (-) 11418.00 in Upazila Shibganj of Chapai Nawabganj district
Periodic Maintenance Program 2005-2006, Bhanga-Faridpur Road Contract no. PMP 2005-06/08