Ongoing

Strengthening of Existing Runway and Taxiway at Osmani International Airport, Sylhet).

Project Overview

 

Strengthening of Existing Runway and Taxiway at Osmani International Airport, Sylhet).

Strengthening of Existing Runway and Taxiway at Osmani International Airport, Sylhet). The work consist of Strengthening of existing Runway and Taxiway with Hot Mix Asphalt Concrete (HMA) including a wearing course using polymer modified bitumen as per supplied design and drawings. The works also include installation of Airfield Ground Lighting (AGL), Signs, markings, Development of side-strips, drainage facilities etc.

project details

  • Year of Completion:

    24/10/2021
  • Employer:

    Civil Aviation Authority of Bangladesh (CAAB)
  • Location:

    Osmani International Airport, Sylhet
  • Contact Value:

    BDT. 3,874.07 Million; US$. 45.58 Million

Related projects

Project Construction of Broad Gauge Rail line from Madhukhali to Magura via Kamarkhali. Major Bridge-1 : 549m with 1683m Viaduct, Major Bridge-2 : 90m & Underpass 60m

Contact Value:   BDT. 4489.49 Million

Construction of four lane asphalt carpeting road with road divider, drain, culverts & footpath from Talaimary mour to Katakhali. (Contract No. RCC/EGP/01/2021-22, E-Tender ID No. 554463). “

Contact Value:   BDT 934.86 Million

Cox’s Bazar Airport (Phase-I)

Contact Value:   US$ 5.30 million

Radisson Water Garden Hotel #5
Railway Line from Majhgram to Dhalarchar via Pabna

Contact Value:   US$. 69.90 million

Reinforced Concrete Works Package – 4 of HSIA Expansion Project, Dhaka