Dredging and Bank Protective Work along the left Bank of Padma River from Majhir Char to Moksedpur via Narishabazar at Dohar Upazila under Dhaka District.
Construction of Bridge of at 17th Km Kochua-Betagi-Patuakhali-Lohalia-Kalaya Road (Z8052)
Construction of 912.32m (21×42.68m) long P.C Girder Sayedpur Bridge at 1st km (Ch.00+847) including Approach Road of Keraniganj (Syedpur).
Construction of 98m PC Girder Bridge on Dayarampur UP – Borboria hat road Bagatipara Part at Ch. 3100m on Boral river under Bagatipara Upazila District Natore.