Ongoing

Improvement of Road from West Side of Bangabandhu Bridge to Hatikamrul Intersection (19.80km) to a 4-Lane Highway

Project Overview

Improvement of Road from West Side of Bangabandhu Bridge to Hatikamrul Intersection (19.80km) to a 4-Lane Highway

Improvement of Road from West Side of Bangabandhu Bridge to Hatikamrul Intersection (19.80km) to a 4-Lane Highway along with Slow Moving Vehicular Traffic (SMVT) Lane on both sides & Structures, Package No. SASEC-II/ICB/MP-1/WP 06 (LOT 2). The work consists of Improvement of existing road from two lanes to four lanes including structures, new bridges and slow moving vehicular traffic lane (SMVT lane) on both sides

project details

  • Year of Completion:

    30/03/2029
  • Employer:

    SASEC Road Connectivity Project-II, Improvement of Elenga-Hatikamrul-Rangpur Road to a 4-Lane Highway, Roads and Highways
  • Location:

    West Side of Bangabandhu Bridge
  • Contact Value:

    BDT. 6,751.74 Million; US$. 79.43 Million

Related projects

Cox’s Bazar Airport (Phase-I)

Contact Value:   US$ 5.30 million

Radisson Water Garden Hotel #5
Railway Line from Majhgram to Dhalarchar via Pabna

Contact Value:   US$. 69.90 million

Reinforced Concrete Works Package – 4 of HSIA Expansion Project, Dhaka
Site Prepration & Earthwork of HSIA Expansion Project, Dhaka
Strengthening of Existing Runway and Taxiway at Shah Amanat International Airport, Chittagong.