Project Overview
Contract for work Package WP-06 [SASEC-II/ICB/MP-1/WP-06 (Lot-2): Part-1: Improvement of Road from Bangabandhu Bridge (West Side) to Hatikamrul (19.80 km) to a 4-Lane Highway along with Slow Moving Vehicular Traffic (SMVT) Lane & Structures. (MAHL 50% Share)