Ongoing

Construction of 98m PC Girder Bridge on Dayarampur UP – Borboria hat road Bagatipara Part at Ch. 3100m on Boral river under Bagatipara Upazila District Natore.

Project Overview

Construction of 98m PC Girder Bridge on Dayarampur UP – Borboria hat road Bagatipara Part at Ch. 3100m on Boral river under Bagatipara Upazila District Natore.

project details

  • Employer:

    Local Government Engineering Department (LGED)
  • Contact Value:

    BDT. 70.09 Million; US$. 0.84 Million
  • Location:

    Natore
  • Year of Completion:

    25/12/2022

Related projects

Cox’s Bazar Airport (Phase-I)

Contact Value:   US$ 5.30 million

Radisson Water Garden Hotel #5
Railway Line from Majhgram to Dhalarchar via Pabna

Contact Value:   US$. 69.90 million

Reinforced Concrete Works Package – 4 of HSIA Expansion Project, Dhaka
Site Prepration & Earthwork of HSIA Expansion Project, Dhaka
Strengthening of Existing Runway and Taxiway at Shah Amanat International Airport, Chittagong.