Ongoing

Construction of 595m. long PC Box Girder Bridge over Bakkhali River at Kusturi Ghat under Sadar Upazila of Cox’s Bazar District.

Project Overview

 

Construction of 595m. long PC Box Girder Bridge over Bakkhali River at Kusturi Ghat under Sadar Upazila of Cox’s Bazar District.

Construction of 595m. long PC Box Girder Bridge over Bakkhali River at Kusturi Ghat under Sadar Upazila of Cox’s Bazar District. The work consists of construction of 595m long PC Box Girder Bridge, 2.3 km approach road including foundation treatment of soft soil by vertical sand drain, 2 lane pavement work, slope protection work and construction of culverts etc.

project details

  • Year of Completion:

    21/11/2021
  • Employer:

    Development of Cox’s Bazar Airport Project (1st Phase), LGED Part
  • Location:

    Cox’s Bazar
  • Contact Value:

    BDT. 2,599.10 Million; US$. 30.58 Million

Related projects

Project Construction of Broad Gauge Rail line from Madhukhali to Magura via Kamarkhali. Major Bridge-1 : 549m with 1683m Viaduct, Major Bridge-2 : 90m & Underpass 60m

Contact Value:   BDT. 4489.49 Million

Construction of four lane asphalt carpeting road with road divider, drain, culverts & footpath from Talaimary mour to Katakhali. (Contract No. RCC/EGP/01/2021-22, E-Tender ID No. 554463). “

Contact Value:   BDT 934.86 Million

Cox’s Bazar Airport (Phase-I)

Contact Value:   US$ 5.30 million

Radisson Water Garden Hotel #5
Railway Line from Majhgram to Dhalarchar via Pabna

Contact Value:   US$. 69.90 million

Reinforced Concrete Works Package – 4 of HSIA Expansion Project, Dhaka