Completed

Bank Revetment work along the left bank of River Padma at Mirerchara

Project Overview

 

Bank Revetment work along the left bank of River Padma at Mirerchara from Meterage M(+)1362.00 to Meterage M (+)1712.00 in connection with “Protection of ChapaNawabganj Sadar and Shibganj upazila from the erosion of the Padma River” Project

Bank Revetment work along the left bank of River Padma at Mirerchara from Meterage M(+)1362.00 to Meterage M (+)1712.00 in connection with “Protection of ChapaNawabganj Sadar and Shibganj upazila from the erosion of the Padma River” Project under Nawabganj O&M Division, BWDB, Chapai Nawabganj during 2008-09

project details

  • Year of Completion:

    30/06/2009
  • Employer:

    Bangladesh Water Development Board
  • Location:

    Chapai Nawabganj
  • Contact Value:

    BDT. 26.76 Million, US$. 0.39 Million

Related projects

Project Construction of Broad Gauge Rail line from Madhukhali to Magura via Kamarkhali. Major Bridge-1 : 549m with 1683m Viaduct, Major Bridge-2 : 90m & Underpass 60m

Contact Value:   BDT. 4489.49 Million

Construction of four lane asphalt carpeting road with road divider, drain, culverts & footpath from Talaimary mour to Katakhali. (Contract No. RCC/EGP/01/2021-22, E-Tender ID No. 554463). “

Contact Value:   BDT 934.86 Million

Cox’s Bazar Airport (Phase-I)

Contact Value:   US$ 5.30 million

Radisson Water Garden Hotel #5
Railway Line from Majhgram to Dhalarchar via Pabna

Contact Value:   US$. 69.90 million

Reinforced Concrete Works Package – 4 of HSIA Expansion Project, Dhaka