Bank Revetment work along the left bank of River Padma at Mirerchara from Meterage M(+)1362.00 to Meterage M (+)1712.00 in connection with “Protection of ChapaNawabganj Sadar and Shibganj upazila from the erosion of the Padma River” Project under Nawabganj O&M Division, BWDB, Chapai Nawabganj during 2008-09