Jamuna River Dredging Work from Km. 0.800 to Km. 1.550 = 0.750 Km. at Kaolibari area in c/w River Bank Protection Project.

Project Overview

Jamuna River Dredging Work from Km. 0.800 to Km. 1.550 = 0.750 Km. at Kaolibari area in c/w River Bank Protection Project.

Jamuna River Dredging Work from Km. 0.800 to Km. 1.550 = 0.750 Km. at Kaolibari area in c/w River Bank Protection Project along the Left Bank of Jamuna River from Kaolibari Bridge to Shakharia (Varua-Bottola) (1st Revised) in Gopalpur upazila during the year 2019¬-20 (Package No. Work-Kaolibari-10/2018-19/Lot-2, E-Tender ID No. 395235). The work consists of Jamuna River Dredging Work from Km. 0.800 to Km. 1.550 = 0.750 Km. at Kaolibari area in c/w River Bank Protection Project along the Left Bank of Jamuna River from Kaolibari Bridge to Shakharia (Varua-Bottola) (1st Revised)

project details

  • Year of Completion:

    30/06/2021
  • Employer:

    Bangladesh Water Development Board (BWDB)
  • Location:

    Jamuna River under Gopalpur upazila
  • Contact Value:

    BDT. 259.63 Million; US$. 3.05 Million

Related projects

Cox’s Bazar Airport (Phase-I)

Contact Value:   US$ 5.30 million

Radisson Water Garden Hotel #5
Railway Line from Majhgram to Dhalarchar via Pabna

Contact Value:   US$. 69.90 million

Reinforced Concrete Works Package – 4 of HSIA Expansion Project, Dhaka
Site Prepration & Earthwork of HSIA Expansion Project, Dhaka
Strengthening of Existing Runway and Taxiway at Shah Amanat International Airport, Chittagong.